Building a custom home in Southwest Florida follows a predictable path: check the lot, design the house, get permits, build, pass inspections and receive a Certificate of Occupancy. Local rules on flood elevation, wind design and utilities shape each step. Here is a plain-language walkthrough, using City of Cape Coral and Collier County requirements as examples.
Step 1: Lot Due Diligence
Before you design anything, find out what the lot will allow.
Zoning and lot rules. Each city and county sets its own zoning. In Cape Coral, for example, the City’s residential plan review guideline lists single-family homes as a permitted use in the R-1, RML, RE and A zoning districts. It also lists minimum setbacks, a minimum home size, and a 60% cap on impervious surfaces such as roof, driveway and patios in R-1 and RML.
Flood zone. In Cape Coral, the City’s Forerunner portal shows a lot’s flood zone, Base Flood Elevation (BFE) and Design Flood Elevation. Elsewhere, FEMA’s Flood Map Service Center is the official source for flood maps.
Utilities. Find out whether the lot has public water and sewer or will need a well and septic system. In Cape Coral, undeveloped lots must connect to City water and sewer before a Certificate of Occupancy is issued. If you build in an area where City lines are planned but not yet working, you will sign a hold harmless agreement. The City may then delay your Certificate of Occupancy until the system is running.
Survey and site. Expect to need a current survey. Cape Coral asks for a sealed survey less than one year old. Collier County asks for a certified site plan no older than six months for new construction.
Wildlife. Cape Coral requires a notarized affidavit that you checked the lot and nearby vacant lots for burrowing owl and gopher tortoise burrows within the last 30 days.
For a deeper look at Cape Coral lots, see our guide to building on a vacant lot in Cape Coral.
Step 2: Design and Engineering
Your plans have to satisfy the Florida Building Code. The 8th Edition (2023) took effect December 31, 2023, and the state is working on a 2026 update.
In Cape Coral, the plan review guideline calls for building plans signed and sealed by a Florida-registered architect or engineer. A typical design package includes:
- Architectural and structural drawings, including foundation, wall sections and roof framing.
- Wind design information. Plans show the wind design criteria, such as wind speed, exposure category, and design pressures for roof and wall components. They also show a continuous load path from the roof down to the foundation.
- Product approvals for windows, doors, garage doors, shutters and roofing. Exterior windows and doors must meet the design wind pressures.
- Truss engineering sealed by a Florida engineer and acknowledged by the engineer of record.
- Energy calculations, including Florida’s energy form and a Manual J cooling load calculation.
- Site and drainage plans showing existing and proposed grades and finished floor elevations.
Collier County’s checklist asks for similar items, including wind loads and design pressures and a list of product approval numbers.
Step 3: Permitting
Your permit comes from the city or county where the lot sits. Cape Coral issues permits inside city limits, while Lee, Charlotte and Collier counties each have building departments for unincorporated areas. Use the checklist for your jurisdiction.
City of Cape Coral. Applications go through the City’s EnerGov online portal. Licensed contractors have filed online since 2024, and the City expects owner-builders to apply online starting July 1, 2026. The City’s one- and two-family checklist includes plans, survey, site and drainage plans, energy calculations, truss plans, a window/door/shutter schedule, an impervious surface sheet and the wildlife affidavit. Seawalls, wells, septic tanks, pools and screen enclosures need their own permits.
Collier County. Collier’s 2025 checklist for new 1 & 2 family homes requires construction plans, energy and load calculations, truss layout and a site planning document. That document must show the crown of the road, flood zone, BFE and proposed finished floor elevation. Most lots also need a stormwater plan. If the road is county-maintained, a right-of-way permit must be issued before the house permit.
Step 4: The Notice of Commencement
Florida’s construction lien law requires a Notice of Commencement (Section 713.13, Florida Statutes). Here is how it works:
- The owner records it with the county clerk before work starts.
- A certified copy, or a notarized statement that it was filed, is posted at the job site.
- It names the property, owner, contractor, any lender and any bond.
- It becomes void if work does not actually start within 90 days of recording.
- It is generally effective for one year unless it states a longer period.
Section 713.135 requires a copy to be filed with the building department before the first inspection on direct contracts over $5,000. Payments made after the notice expires can count as “improper payments,” which may mean paying twice for the same work. Cape Coral’s form warns owners who plan to finance to consult their lender or an attorney before recording.
If you are weighing whether to act as your own contractor, read our comparison of owner-builder vs. licensed contractor in Florida.
Step 5: Construction and Inspections
Each stage of construction is inspected before the next covers it up. Your permit lists the exact inspections. On a typical concrete-block home they include the foundation, floor slab, tie beam, framing and sheathing, roof, rough plumbing, electrical and mechanical, insulation, and finals.
In Cape Coral, a permit becomes void if the first inspection is not made within six months of issuance, or if six months pass without an inspection after the last one passed.
Step 6: Elevation Certificates in Flood Zones
If the lot is in a Special Flood Hazard Area, you will need Elevation Certificates. FEMA says they are prepared and certified by a licensed land surveyor, registered professional engineer or architect, and are used to verify that construction meets building requirements. Collier County notes they are also used to set flood insurance rates.
Timing is set locally:
- Cape Coral requires an “Under Construction” Elevation Certificate after the floor slab inspection but before the tie beam inspection, plus a final certificate. The lowest floor of living areas must be at least 1 foot above the BFE.
- Collier County requires an Under-Construction Elevation Certificate with a 10-day spot survey after the lowest floor is set. It places an inspection hold on permits that miss that deadline. The Finished Construction certificate is due after equipment such as A/C units is installed and grading is complete.
Step 7: Final Inspection and Certificate of Occupancy
After final inspections pass, the building department issues a Certificate of Occupancy (CO). Cape Coral’s permit application states that a new home may not be used or occupied until an approved CO is issued. Collier County may also require a spot survey before the CO.
How Long Does It Take?
Timelines vary from project to project. Common factors include:
- How complete the permit submittal is, and whether plans must be revised
- Utility availability (a CO can wait on City water and sewer in UEP areas)
- Seawall permits on canal lots (if Cape Coral permits a home before its seawall, the home cannot be occupied until the seawall is finished and passes inspection)
- Protected wildlife that requires state or federal permits before work begins
- Flood elevation, fill and drainage design
- Weather, inspection scheduling and design changes during construction
Warranty and Closeout Questions to Ask Your Builder
- What warranty do you provide in writing, what does it cover, and for how long?
- Which manufacturer warranties (roof, windows, A/C, appliances) transfer to me, and when?
- Will I receive as-built drawings, product manuals and the final Elevation Certificate?
- How will final payments and lien releases be handled?
- How do I report a problem after move-in?
Florida also has a formal pre-suit process for construction defect claims. Under Chapter 558, a homeowner generally must give the builder written notice at least 60 days before filing suit. You can check a contractor’s license at myfloridalicense.com.
Quick Checklist Before You Build
- Zoning, setbacks and lot coverage limits
- Flood zone, BFE and required floor elevation
- Water, sewer or well and septic plans
- Current survey and wildlife check
- Sealed plans with wind and energy design
- Notice of Commencement recorded and posted
- Elevation Certificates, if in a flood zone
Requirements change and differ by jurisdiction. Confirm current rules with your city or county building department or a licensed professional.
Ready to Start?
Proudhouse Builders plans, designs and builds homes in Southwest Florida. Learn more on our services page, call us at (239) 321-0594, or reach out through our contact page. You bring the land, we do the rest.
Sources
- City of Cape Coral, Plan Review Guideline – New Construction Residential (rev. 09/02/21): capecoral.gov/Documents/Document%20Hub/Permit%20Document%20C…
- City of Cape Coral, One- or Two-Family Dwelling Building Permit Application packet (rev. 2021): capecoral.gov/Documents/Document%20Hub/Permit%20Document%20C…
- City of Cape Coral, Flood Protection: capecoral.gov/departments/development_services/building_divi…
- City of Cape Coral, UEP Frequently Asked Questions: capecoral.gov/uep/frequently_asked_questions.php
- City of Cape Coral, “City Transitioning to Online-First Permitting July 1” (June 12, 2026): capecoral.gov/news_detail_T4_R700.php
- Collier County, Application Requirements – 1&2 Family Home (PRFH, 3/19/2025): collier.gov/files/assets/county/v/1/building-plan-review/doc…
- Collier County, Bulletin 21: Survey & Elevation Certificate Requirements (amended Nov. 4, 2025): collier.gov/files/assets/county/v/2/building-plan-review/doc…
- Florida Statutes, Section 713.13, Notice of Commencement: leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&…
- Florida Statutes, Section 713.135, Notice of commencement and applicability of lien: leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&…
- Florida Statutes, Section 558.004, Notice and opportunity to repair: leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&…
- Florida Building Commission, Building Codes: floridabuilding.org/c/default.aspx?menu=Building_Codes
- FEMA, Working with Flood Risk: Engineers, Surveyors or Architects: fema.gov/flood-maps/know-your-risk/engineer-surveyor-archite…
- FEMA, Flood Maps: fema.gov/flood-maps